Solargraf’s commitment to staying current with AHJ updates benefits both installers and customers. Our software now seamlessly incorporates these recent changes, streamlining the design and proposal process. Stay informed and take advantage of these enhancements!
All AHJs updates
- Update: An outside emergency disconnect is required at all one- and two-family dwelling units when altering/replacing the service or panel.
- Effective Date: As per the 2023 NEC.
California, Florida, New Jersey, Ohio, Oregon, Texas, Virginia, and Washington updates
- Update: These states have adopted a new version of governing codes as shown in the chart below:
State |
New Adoption Code |
Existing Adoption Code (To be deprecated) |
Codes Adoption Cycle |
Adoption Effective Date |
Next Expected Adoption Date |
California
|
2022 California Electrical Code 2022 California Building Code 2022 California Residential Code 2022 California Fire Code 2022 California Energy Code 2022 California Existing Building Code
|
2019 California Electrical Code 2019 California Building Code 2019 California Residential Code 2019 California Fire Code 2019 California Energy Code 2019 California Existing Building Code
|
3 Years |
01-Jan-23 |
01-Jan-26 |
Florida |
2020 National Electrical Code |
2017 National Electrical Code |
3 Years |
31-Dec-23 |
01-Jan-27 |
New Jersey |
2020 National Electrical Code 2021 International Building Code, NJ Edition 2021 International Residential Code, NJ Edition 2021 International Fire Code
|
2017 National Electrical Code 2018 International Building Code, NJ Edition 2018 International Residential Code, NJ Edition 2018 International Fire Code
|
3 Years |
6-Sep-22 |
1-Sep-25 |
Ohio |
2023 National Electrical Code 2024 Ohio Building Code 2024 Ohio Plumbing Code 2024 Ohio Mechanical Code 2024 Ohio Existing Building Code 2021 Ohio Energy Code 2019 Residential Code of Ohio 2017 Ohio Fire Code
|
2017 National Electrical Code 2017 Ohio Building Code 2017 Ohio Plumbing Code 2017 Ohio Mechanical Code 2017 Ohio Existing Building Code 2017 Ohio Energy Code 2019 Residential Code of Ohio 2017 Ohio Fire Code |
|
March 1, 2024 |
|
Oregon |
2023 Oregon Electrical Specialty Code 2023 Oregon Residential Specialty Code 2022 Oregon Structural Specialty Code 2022 Oregon Fire Code 2022 Oregon Mechanical Specialty Code 2021 Oregon Existing Building Code |
2020 Oregon Electrical Specialty Code 2021 Oregon Residential Specialty Code 2019 Oregon Structural Specialty Code 2019 Oregon Fire Code 2019 Oregon Mechanical Specialty Code 2018 Oregon Existing Building Code |
3 years |
October 1, 2022 |
October 1, 2025 |
Texas |
2023 National Electrical Code |
2020 National Electrical Code |
3 Years |
1-Sep-23 |
31-Aug-26 |
Virginia |
2020 National Electrical Code |
2017 National Electrical Code |
3 Years |
18-Jan-24 |
18-Jan-27 |
Washington |
2020 National Electrical Code 2021 Washington State Building Code 2021 Washington State Existing Building Code 2021 Washington State Fuel Gas Code 2021 Washington State Mechanical Code 2021 Washington State Residential Code 2021 Washington State Wildland-Urban Interface Code 2021 Uniform Plumbing Code 2021 International Swimming Pool and Spa code |
2020 National Electrical Code 2018 Washington State Building Code 2018 Washington State Existing Building Code 2018 Washington State Fuel Gas Code 2018 Washington State Mechanical Code 2018 Washington State Residential Code 2018 Washington State Wildland-Urban Interface Code 2018 Uniform Plumbing Code 2018 International Swimming Pool and Spa code |
3 years |
March 15, 2024 |
March 15, 2027 |
AHJ and utility updates
- Update: California, Texas, and Arizona have made some changes in AHJs and utilities as shown below and the Solargraf utility and AHJ database is updated as per the latest changes.
California updates
- City of Newport Beach: EMT conduit is not allowed for exterior applications.
- City of Riverside: When derating the main breaker, include the load calculation with the panel schedule in the plan-set.
- City of Lake Forest & East Vale: Battery backup designs, add the load calculation with the panel schedule to the plan-set.
- County of Los Angeles: Check for oak trees on the site address; if present, they must be shown on the plan-set.
- Utility of Southern California Edition: For GMA Interconnection, the Fused AC Disconnect must be located within 2-3 ft from the SCE Meter. Specific dimensions and installation requirements apply.
- City of Livermore: Livermore requires a separate permit for EV project.
County of Contra Costa: City requires that all sheets have a 3.5″ x 6″ column (box) on the right side for city comments and stamps.
Arizona updates
- City of Peoria: A photo of the service panel schedule is now required on the plan-set. Breakers must be accurately labeled.
- City of Surprise: Plan-sets must meet specific requirements, including a clear space for approval stamps and individual file uploads in landscape orientation.
Texas updates
- Oncor Utility: Oncor Utility requesting Plat Map instead of Vicinity Map.
Please note that the information provided is based on the updates received from AHJ and Utility authorities and may be subject to further updates or changes. Always consult the latest local regulations and AHJ guidelines for the most accurate and up-to-date information. If you have any additional questions, feel free to ask!